- Age rating4+
- CategoryUtilities
- DeveloperBKW Energie AG
- LanguagesEnglish
- Size23.2 MB
Links to the official App Store page
Download.org hosts no file of Juvent - Wind farm. The button opens its official App Store page, published by BKW Energie AG. Listing last checked on Nov 16, 2026.
About
Experience the Juvent Wind farm and get live information about the wind turbines and the current alarm events.
With 16 wind turbines, the wind farm on the Mont-Crosin and Mont-Soleil in the Bernese Jura is the biggest and oldest of Switzerland.
Its history began in 1996 with the construction of the first 3 wind turbines on the Mont-Crosin, close to the existing solar plant by Juvent SA, a subsidiary of the energy and infrastructure company BKW.
After multiple extensions, the wind farm currently consists of 16 wind turbines.
With a yearly production of about 70 GWh, the wind farm can supply more than 15'000 households with wind power.
Main app functionalities:
- Turbines overview on an interactive map
- Live production data of the wind farm
- Detail overview of the power, ambient temperature, wind speed, wind direction of each individual turbine
- Chart of the produced power over the last 48 hours
- Notifications in case of lightning, storm or ice fall/ice throw risk
- Announcements on the home page
What’s new
Version 3.0.4 · Aug 17, 2026
- Add support to newer devices
- Small fixes and improvements
App privacy
What BKW Energie AG declares on the App Store about how this app handles data.
-
Data not collected
The developer does not collect any data from this app.
Privacy practices may vary, for example with the features you use or your age.
Information
- Seller
- BKW Energie AG
- Category
- Utilities
- Version
- 3.0.4
- Updated
- Aug 17, 2026
- Released
- Sep 14, 2013
- Size
- 23.2 MB
- Requires
- iOS 13.0 or later
- Age rating
- 4+
- Price
- Free
- Languages
- English
- Copyright
- © Juvent SA














