- Batasan usia4+
- KategoriBisnis
- PengembangAniruddha Telemetry Systems Pvt. Ltd.
- BahasaInggris
- Ukuran71,6 MB
Tertaut ke halaman resmi App Store
Download.org tidak menyimpan file JPL ITMS apa pun. Tombol ini membuka halaman aplikasi di App Store, tempat Aniruddha Telemetry Systems Pvt. Ltd. menerbitkannya. Halaman terakhir diperiksa pada 15/11/2026.
Tentang
Pengembang belum menyediakan teks ini dalam bahasa Anda.
The JPL Dashboard offers a comprehensive overview of key operational and logistical metrics across multiple segments of plant operations. It is designed to provide actionable insights with real-time visibility to optimize workflows, enhance productivity, and ensure operational efficiency. The dashboard is divided into five cards, each dedicated to a specific area of operations: PLANT, ASH, GARE PALMA IV/1, GARE PALMA IV/2-3, and CHPO.
PLANT
- Total Coal Received: The total amount of coal received at the plant.
- Total GRN: The total number of Goods Receipt Notes (GRNs) generated.
- Total Trucks: The count of trucks utilized in operations.
- Total Trips: The total number of trips completed.
- Avg TAT (Turnaround Time): The average time taken for each truck from entry to exit.
ASH
- Total Dispatch: The total quantity of ash dispatched to various destinations.
- Total Trips: The number of trips completed for ash transportation.
- Pond Quantity: The current quantity of ash stored in ponds.
- Fly Quantity: The quantity of fly ash generated or stored.
GARE PALMA IV/1
- Coal Dispatch: The total quantity of coal dispatched from this location.
- Coal Excavated: The amount of coal extracted from this site.
- OB Removed: The overburden removed during mining operations.
- Ash Received: The amount of ash received at this location.
- Trips: The total number of trips associated with this site.
GARE PALMA IV/2-3
- Coal Dispatch: Coal dispatched from these mining areas.
- Coal Excavated: The total amount of coal excavated.
- OB Removed: Overburden management during operations.
- Ash Received: The amount of ash received at this location.
- Trips: Operational trips related to logistics and dispatch.
CHPO (Central Handling and Processing Office)
- Total Coal Received: The aggregate amount of coal received at this location.
- Total GRN Done: The total number of GRNs processed.
- Total Trucks: The count of vehicles used for transportation.
- Received from IV/1 and IV/2-3: The quantities received from these respective locations.
The dashboard’s design ensures that stakeholders can quickly evaluate performance, track key metrics, and pinpoint areas for improvement across plant operations. Whether managing coal logistics, overseeing ash dispatch, or monitoring mining output, the JPL Dashboard makes critical data easily accessible to help teams maintain efficient operations and optimize overall productivity.
Yang baru
Versi 1.0.10 · 7/10/2026
New release.
Privasi aplikasi
Yang dinyatakan Aniruddha Telemetry Systems Pvt. Ltd. di App Store tentang cara aplikasi ini menangani data.
-
Data tidak dikumpulkan
Pengembang tidak mengumpulkan data apa pun dari aplikasi ini.
Praktik privasi dapat bervariasi, misalnya berdasarkan fitur yang Anda gunakan atau usia Anda.
Informasi
- Penjual
- ANIRUDDHA TELEMETRY SYSTEMS PRIVATE LIMITED
- Kategori
- Bisnis
- Versi
- 1.0.10
- Diperbarui
- 7/10/2026
- Dirilis
- 21/3/2025
- Ukuran
- 71,6 MB
- Memerlukan
- iOS 13.0 atau yang lebih baru
- Batasan usia
- 4+
- Harga
- Gratis
- Bahasa
- Inggris
- Hak cipta
- © ATS













