The JPL Dashboard offers a comprehensive overview of key operational and logistical metrics across multiple segments of plant operations. It is designed to provide actionable insights with real-time visibility to optimize workflows, enhance productivity, and ensure operational efficiency. The dashboard is divided into five cards, each dedicated to a specific area of operations: PLANT, ASH, GARE PALMA IV/1, GARE PALMA IV/2-3, and CHPO.
PLANT
- Total Coal Received: The total amount of coal received at the plant.
- Total GRN: The total number of Goods Receipt Notes (GRNs) generated.
- Total Trucks: The count of trucks utilized in operations.
- Total Trips: The total number of trips completed.
- Avg TAT (Turnaround Time): The average time taken for each truck from entry to exit.
ASH
- Total Dispatch: The total quantity of ash dispatched to various destinations.
- Total Trips: The number of trips completed for ash transportation.
- Pond Quantity: The current quantity of ash stored in ponds.
- Fly Quantity: The quantity of fly ash generated or stored.
GARE PALMA IV/1
- Coal Dispatch: The total quantity of coal dispatched from this location.
- Coal Excavated: The amount of coal extracted from this site.
- OB Removed: The overburden removed during mining operations.
- Ash Received: The amount of ash received at this location.
- Trips: The total number of trips associated with this site.
GARE PALMA IV/2-3
- Coal Dispatch: Coal dispatched from these mining areas.
- Coal Excavated: The total amount of coal excavated.
- OB Removed: Overburden management during operations.
- Ash Received: The amount of ash received at this location.
- Trips: Operational trips related to logistics and dispatch.
CHPO (Central Handling and Processing Office)
- Total Coal Received: The aggregate amount of coal received at this location.
- Total GRN Done: The total number of GRNs processed.
- Total Trucks: The count of vehicles used for transportation.
- Received from IV/1 and IV/2-3: The quantities received from these respective locations.
The dashboard’s design ensures that stakeholders can quickly evaluate performance, track key metrics, and pinpoint areas for improvement across plant operations. Whether managing coal logistics, overseeing ash dispatch, or monitoring mining output, the JPL Dashboard makes critical data easily accessible to help teams maintain efficient operations and optimize overall productivity.
新機能
バージョン 1.0.10 · 2026/10/7
New release.
アプリのプライバシー
このアプリのデータの取り扱いについて、Aniruddha Telemetry Systems Pvt. Ltd.がApp Storeで申告している内容です。
-
データの収集なし
開発元はこのアプリからデータを収集しません。
プライバシーの取り扱いは、ご利用の機能やお客様の年齢などに応じて異なる場合があります。
情報
- 販売元
- ANIRUDDHA TELEMETRY SYSTEMS PRIVATE LIMITED
- カテゴリ
- ビジネス
- バージョン
- 1.0.10
- 更新日
- 2026/10/7
- リリース
- 2025/3/21
- サイズ
- 71.6 MB
- 必要条件
- iOS 13.0以降
- 対象年齢
- 4+
- 価格
- 無料
- 言語
- 英語
- 著作権
- © ATS