Skip to content

JPL ITMS

ITMS

Designed for iPhone, iPad, iPod touch

View in App Store
  • Age rating4+
  • CategoryBusiness
  • DeveloperAniruddha Telemetry Systems Pvt. Ltd.
  • LanguagesEnglish
  • Size71.6 MB

Links to the official App Store page

Download.org hosts no file of JPL ITMS. The button opens its official App Store page, published by Aniruddha Telemetry Systems Pvt. Ltd. Listing last checked on Nov 15, 2026.

Screenshots

  • JPL ITMS screenshot 1
  • JPL ITMS screenshot 2
  • JPL ITMS screenshot 3
  • JPL ITMS screenshot 4
  • JPL ITMS screenshot 5
  • JPL ITMS screenshot 6
  • JPL ITMS screenshot 7
  • JPL ITMS screenshot 8
  • JPL ITMS screenshot 9
  • JPL ITMS screenshot 10

About

The JPL Dashboard offers a comprehensive overview of key operational and logistical metrics across multiple segments of plant operations. It is designed to provide actionable insights with real-time visibility to optimize workflows, enhance productivity, and ensure operational efficiency. The dashboard is divided into five cards, each dedicated to a specific area of operations: PLANT, ASH, GARE PALMA IV/1, GARE PALMA IV/2-3, and CHPO.
PLANT
- Total Coal Received: The total amount of coal received at the plant.
- Total GRN: The total number of Goods Receipt Notes (GRNs) generated.
- Total Trucks: The count of trucks utilized in operations.
- Total Trips: The total number of trips completed.
- Avg TAT (Turnaround Time): The average time taken for each truck from entry to exit.

ASH
- Total Dispatch: The total quantity of ash dispatched to various destinations.
- Total Trips: The number of trips completed for ash transportation.
- Pond Quantity: The current quantity of ash stored in ponds.
- Fly Quantity: The quantity of fly ash generated or stored.

GARE PALMA IV/1
- Coal Dispatch: The total quantity of coal dispatched from this location.
- Coal Excavated: The amount of coal extracted from this site.
- OB Removed: The overburden removed during mining operations.
- Ash Received: The amount of ash received at this location.
- Trips: The total number of trips associated with this site.

GARE PALMA IV/2-3
- Coal Dispatch: Coal dispatched from these mining areas.
- Coal Excavated: The total amount of coal excavated.
- OB Removed: Overburden management during operations.
- Ash Received: The amount of ash received at this location.
- Trips: Operational trips related to logistics and dispatch.

CHPO (Central Handling and Processing Office)
- Total Coal Received: The aggregate amount of coal received at this location.
- Total GRN Done: The total number of GRNs processed.
- Total Trucks: The count of vehicles used for transportation.
- Received from IV/1 and IV/2-3: The quantities received from these respective locations.

The dashboard’s design ensures that stakeholders can quickly evaluate performance, track key metrics, and pinpoint areas for improvement across plant operations. Whether managing coal logistics, overseeing ash dispatch, or monitoring mining output, the JPL Dashboard makes critical data easily accessible to help teams maintain efficient operations and optimize overall productivity.

What’s new

Version 1.0.10 · Oct 7, 2026

New release.

App privacy

What Aniruddha Telemetry Systems Pvt. Ltd. declares on the App Store about how this app handles data.

  • Data not collected

    The developer does not collect any data from this app.

Privacy practices may vary, for example with the features you use or your age.

Information

Seller
ANIRUDDHA TELEMETRY SYSTEMS PRIVATE LIMITED
Category
Business
Version
1.0.10
Updated
Oct 7, 2026
Released
Mar 21, 2025
Size
71.6 MB
Requires
iOS 13.0 or later
Age rating
4+
Languages
English
Copyright
© ATS